The History of
TuffWrap Installations

TuffWrap started with a problem, an entrepreneur, and a sheet of polyethylene. More than 25 years later, that founding ingenuity is still the engine behind every system we engineer and every facility we protect.

The TuffWrap Story

David Campbell, President and Founder, recognized a persistent problem: dust and debris falling from above was contaminating active workspaces during reroofing. His solution was practical and ingenious—suspend a polyethylene sheet below the roof deck to catch debris before it reached the facility floor.

It worked. It got noticed. The first formalized project was completed in 1999: a suspended cover temporary ceiling for a 40,000 sq. ft. picture frame manufacturer. Soon after, TuffWrap landed its first Fortune 500 client—a multi-billion-dollar food company in Hershey, Pennsylvania.

"Imagine construction without contamination... that is exactly what TuffWrap Installations President and Founder David Campbell did."
1999
FIRST INTERIOR PROTECTION PROJECT

Reroofing of a 40,000 sq. ft. picture frame manufacturer (David/Randall Associates). The suspended cover captures accumulated dust and debris — and works.

2000
FIRST TRADE SHOW

TuffWrap introduces the interior protection concept to roofing contractors at its first industry trade show.

2002
INCORPORATION

After realizing the need for interior protection, formed TufWrap Systems, Inc. Later changed to TuffWrap® Installations, Inc..

2003
SERVICE EXPANDED

Began providing services nationwide and in Canada.

2004
1ST C.O.R.E. FRAMELESS WALL® PROJECT

Major floor removal and renovation in print facility. Developed techniques to build a wall system without studs that could stand up to construction site demands. Major floor removal and renovation in print facility. .

2008
ANTI-STATIC / ANTI-MICROBIAL MATERIAL

Began using anti-static and anti-microbial materials.

2009
SMARTSEAM® DEVELOPMENT / HQ ESTABLISHED

After realizing the need for interior protection, formed TufWrap Systems, Inc. Later changed to TuffWrap® Installations, Inc..

2011
1ST HYBRID WALL™ PROJECT

Major food manufacturer needed more than poly because fork truck movements of pallets damaged the wall system. Developed 4 ft. tall...

2012
Commencement of UL Classification Testing

 Started process of seeking UL 723S classification. First two designs are tested but failed to pass.

2013
Successful UL Classification and Manufacturing Upgrades

he third completed design passed the UL 723S test and SmartSeam® became UL classified for installation under sprinklers. In the fall the first SmartSeam® job took place at Samuel Adams, Allentown, PA.

2014
Machinery Refined & TuffWrap Dust Cap Developed

Developed and refined manufacturing techniques and machinery to manufacture SmartSeam and the TuffWrap unique dust cap. The manufacturing equipment was designed, developed, and built in-house.

2015
Development of Specialized Pocket Doors and Wall Systems

Developed and finalized the unique TuffWrap pocket door design. Hybrid walls were also developed for areas with heavy foot traffic and equipment traffic involving TuffWrap proprietary bracing and TuffWrap proprietary food grade TuffPanels.

2016
Operational and Safety Program Enhancements

Developed a company-wide safety program led by a degreed and accredited safety manager.

Added a dedicated US and Canada based Project Manager/Estimator team.

2018
Standardizing Quality Control Documentation

Developed and implemented stringent Quality Control processes and documentation for the purpose of achieving code compliance.

2019
Introduction of TuffWrap EXTreme® Exterior Protection

Began developing TuffWrap temporary exterior walls (EXTreme Walls).

The first EXTreme job replaced heat shrink materials and processes used in the past. EXTreme Walls offers two key advantages over heat shrink: no heat is required to tighten the plastic (eliminating safety hazards associated with open flames on the construction site), and the EXTreme walls are made from reinforced polymer plastic sheet that is tear-resistant.  

2020
Attaining IBC Compliance and Canadian Growth

TuffWrap SmartSeam® receives International Building Code (IBC) compliance.

TuffWrap Canada ULC is established in the Province of Ontario.

2022
Achievement of FM Approval

TuffWrap SmartSeam® receives FM Approval as a Class 4652 material.

2023
Celebrating the 10-Year SmartSeam® Milestone

A Decade of Code-Compliant Protection. Celebrating SmartSeam® - 10 years, 50,000 rolls & 75 million sq. ft. of protection.

2024
Commemorating 25 Years of Operation

1999-2024, Celebrating Silver. Going for Gold. Celebrating 25 Years of Keeping the Outside Out and the Inside Safe.

SEE THE WORK BEHIND THE STORY

Nearly 15,000 projects across North America

Browse our case studies by industry and meet our team.