TuffWrap C.O.R.E.-HS Walls protects an Ice Cream & Beverage Facility

ice cream and beverage
TUFFWRAP INSTALLATIONS TURNKEY SOLUTION

INDUSTRY Food & Beverage
SOLUTION C.O.R.E.-HS Walls & Doors
PROJECT SIZE 145 LF of Walls

When the going got Tuff…

The Job Challenge

 

When Kroger’s Ice Cream & Beverage facility needed to install new production equipment, they could not afford the risk of contamination from dust, debris, and other environmental factors. TuffWrap® C.O.R.E.-HS Walls & Doors and a HEPA filtration system were the perfect solution implemented to protect the facility within a designated timeframe.

The installation of the new production line at Kroger’s Ice Cream & Beverage facility in Springdale, OH, required the removal of a large wall. To establish a clearly defined construction area while preventing contamination from dust, debris, and other environmental factors, TuffWrap® Installations collaborated with the general contractor, EGC Construction. This solution ensured the safety of employees and products by protecting the facility from contaminants during construction.

 

TuffWrap Solution

 

TuffWrap® Installations installed temporary interior barriers to protect the facility from dust and debris during equipment installation and meet the tight deadline. In addition, these high-strength barriers allowed for the maintenance of air quality and airflow.

During the project, the team focused on key concerns:

  • Creating a clearly defined construction area
  • Maintaining air quality and proper airflow
  • Protecting employees, equipment, and products from dust and debris
  • Providing safe access for personnel and equipment
  • Meeting strict project deadlines

 

TuffWrap installed 10-mil thick polyethylene C.O.R.E.-HS Walls and doors to contain dust and debris. These heavy-duty walls were securely attached to the ceiling and floor, creating a sealed construction area. A HEPA filtration system worked in conjunction with the high-strength walls to control air quality by pulling contaminated air out through a ceiling vent and trapping particles within the filter. The flexibility of TuffWrap’s solutions allowed for installation and removal within a single day.

Additionally, two zipper and roller construction doors were installed to provide safe access points. The custom doors facilitated easy entry for forklifts, dump carts, scissor lifts, and personnel.

 

TuffWrap C.O.R.E.-HS Walls

Conclusion

 

The TuffWrap C.O.R.E.-HS temporary high-strength interior walls ensure maximum performance during construction or renovation while separating the work environment from the construction zone. In addition to protecting against dust, debris, and weather, C.O.R.E.-HS can manage building pressure differential, airflow, and heat loss. Maintaining air quality at a job site enhances comfort, protects work materials’ integrity, and helps keep projects on schedule.

The rapid installation and removal of the temporary barriers demonstrate TuffWrap’s commitment to providing high-performance solutions that safeguard employees and products, ensuring construction processes remain on schedule.

“TuffWrap was great. Gary and Herbert were great to work with. The schedule was moved several times and TuffWrap was right there with us, reacting to the changes as well. That was very appreciated. We would definitely use and recommend them for sure.”

“Not having to worry about maintaining the wall, that burden of maintaining the wall so we could focus on the work, was a huge advantage to our guys. We probably went in and out of the zipper and construction doors multiple times a day, five days a week, 20 times a day. They withstood the use throughout the entire project.”

“There were no major issues, and the small ones we worked through. I’m glad I had support from TuffWrap’s team to help out and get that taken care of.”

– J. Pierce, Industrial Project Manager, EGC Construction Corporation

 

TuffWrap Construction Doors

 

There’s no stopping industrial construction, but TuffWrap is here to prevent the dust and debris damage it can cause. TuffWrap® Installations is the North American leader in dust, debris, and weather containment solutions, keeping facilities operational while providing innovative protection during reroofing, renovation, and reconstruction projects.

 

Read more about high-strength C.O.R.E-HS Walls here!

 

Watch Videos about TuffWrap here!
Aerospace | Food & Beverage | Industrial & Commercial | Manufacturing | Pharmaceutical | Retail | Warehouse & Distribution

 

TuffWrap® Installations is the North American leader in dust, debris, and weather containment solutions, keeping facilities operational while providing innovative protection during re-roofing, renovation, and reconstruction projects.